IN the electricity generation industry, plans are underway to install more transformers at Hlawga main power station in Mingaladon Township of Yangon Region, according to Director-General of the Electric Power Transmission and System Control Department, U Thura Aung Bo.
Yesterday afternoon, Union Minister
for Electric Power U Nyan Tun heard reports on the power transmission and
distribution conditions of the Hlawga main power station by the
director-general at the Hlawga natural gas power plant.
After the presentation, the Union
Minister stressed the need to systematically operate the stations with
maintenance before building new ones. He pointed out that systematic
maintenance schedule must be schemed for the regular operation of machinery.
At the control rooms, the Union
Minister inspected supply of electricity in connection with the national grids,
operation of power stations, and generating electricity by Myanmar Central
Power Co Ltd and UPP Power (Myanmar) Ltd.
MNA/KZW

No comments:
Post a Comment