The
handover ceremony of new school buildings, which were constructed with the
assistance of Japan International Cooperation Agency (JICA), to the Ministry of
Education, was held at No. 9 Basic Education High School, Mingan ward, Sittway
town, on 17 July morning.
The
ceremony was attended by Dr. Myo Thein Gyi, Union Minister for Education; U Nyi
Pu, Chief Minister of Rakhine State, Maj-Gen Than Htut, Deputy Minister for
Border Affairs, U Soe Aung, Deputy Minister for Social Welfare, Relief and
Resettlement, U Kyaw Lin, Deputy Minister for Construction, Mr. Ichiro
Maruyama, Ambassador of Japan to Myanmar, Mr. Masayuki Karasawa, Chief
Representative of the JICA Myanmar Office, U Aung Than Myint, Rakhine State
Education Officer, teachers, students and other officials from related
departments.
The
ceremony opened with Myanmar school songs sung by the students
of B.E.H.S Mingan School. Then, Dr. Myo Thein Gyi, Union Minister for
Education, gave the opening speech stating that the schools were damaged by
floods and landslides in 2015. Therefore, the Japan government provided 5
billion yen. The Ministry of Education spent 1.5 billion yen (Ks15 billion) to
construct 82 schools. Of the 82 schools, 39 have been constructed in Rakhine
State. The 33 schools, including Mingan School in Rakhine State, which were
constructed with the assistance of JICA have been 100 per cent completed.
Now,
students from Rakhine State can safely and happily access education. For the
sustainability of the new schools, we should maintain the schools together.
Then,
Rakhine State Chief Minister U Nyi Pu, Mr. Ichiro Maruyama, Ambassador of Japan
to Myanmar, and Mr. Masayuki Karasawa, Chief Representative
of the JICA Myanmar Office, gave speeches, while Rakhine State Education
Officer U Aung Than Myint expressed thanks.
Mr.
Masayuki Karasawa handed over the documents related to the new school buildings
to Rakhine State Education Officer U Aung Than Myint. The union minister, State
chief minister, deputy ministers and Japanese ambassador sprinkled scented
water on the stone inscription of the school.
The
union minister and officials inspected the school building and gave an
encouraging speech to the students at the school.
The
new buildings were constructed in January 2017 by Hlaing Myint Moe Tun
Construction Company. They were completed in September. The construction of two
buildings, which is an RC two-storey building with 102x30 foot rooms, cost a
total of Ks278.23 million.
Myint
Maung Soe
Ref;
The Global New Light of Myanmar
No comments:
Post a Comment